Most people don’t walk into a racking conversation with a list of questions for the supplier. They walk in with a problem. Stock is all over the warehouse floor, it’s slowing everyone down, and something has to change.
That’s how it went with a recent customer of ours who manufactures worktops. Their warehouse had worktops stacked flat across the floor. If the piece they needed was at the bottom of a pile, someone had to move everything else out of the way first. They didn’t ask us if we were SEMA approved or what our lead time was. They said, we’ve got this product, and we need to store it better.
That’s the real starting point. The supplier questions still matter, but only because the answers tell you whether a company can actually solve the problem you’ve got, safely, and for longer than a few months. Here’s what we’d ask, based on jobs we’ve actually done.
Have they engineered this for what you're actually storing?
For the worktop customer, the challenge wasn’t just fitting more onto less floor space. Their product had to stay completely flat over time, so the cantilever system we designed had to keep arm deflection to around 1mm over the length of the pack. That’s not a number you get off a catalogue system. It comes from someone engineering the racking around your product, not the other way round.
The result was more storage. They went vertical instead of floor stacking, so the same footprint now holds a lot more stock. It also changed how the warehouse runs day to day. Stock now moves down through the levels to a dedicated picking level on the bottom arm, so operatives take what they need without shifting anything else out of the way. Ask a supplier directly: have you designed this around my product, or dropped a standard system into my space?
is the racking built for how you'll actually use it?
We were approached by Rexel, the UK’s largest cable distributor, after a new facility in Doncaster ran into trouble. They’d ordered coil racking from a different manufacturer, a big job running into hundreds of thousands of pounds. Once it was loaded, their own health and safety manager condemned it. It was flexing and moving under load, and they told the original supplier to take it out.
What that system missed was the dynamic pull force involved. The racking wasn’t just holding static weight, it was being used while cable was decanted off the coil in situ, wound onto smaller bobbins and cut for distribution, a pull force of around two tonnes while the coil was live on the rack. We designed and installed a heavy duty coil racking system built around that specific load. Rexel were happy enough with the result that we’ve now completed three of their sites, with two more currently being quoted.
Ask a supplier how they account for the loads your operation actually creates, not just the weight sitting still on a shelf. What’s rated for storage and what’s rated for how you’ll use it aren’t always the same thing.
are they sema approved, and do they understand codes for racking types that aren't standard?
SEMA approval covers manufacturing standards, and larger companies increasingly ask for it. We ran into an unusual situation with a leading UK kitchens manufacturer, on what was at the time our largest job to date. They asked if we were SEMA approved for the hot rolled cantilever racking we’d proposed. At that point there wasn’t yet a SEMA code covering that racking type, because the existing cantilever code had been written around cold rolled steel, which behaves differently under load.
That wasn’t a dead end. We provided full independent calculations to show the system conformed to the required standard, which let the project go ahead. Since then, our structural engineer has worked directly with SEMA on a code for hot rolled cantilever racking, going through the calculations and independent testing needed to get it properly recognised. Very few cantilever racking manufacturers hold SEMA approval at all. Ask whether a supplier does, and if your racking is anything non standard, ask whether they can actually prove conformance rather than just point at a certificate.
WHO'S INSTALLING IT, AND WHO'S INSPECTING IT AFTERWARDS?
SEMA approval is only one part of the picture. We use SEIRS registered installers (the Storage Equipment Installers Registration Scheme), people who’ve been through a proper training course to install to that code. Racking should also be inspected every year by a SARI inspector (a SEMA Approved Racking Inspector). We currently outsource that, with plans to bring it in house.
Manufacturing, installation and inspection are three separate checks. A supplier who can only speak confidently to one of them is only giving you part of the picture, and that matters both for safety and for your insurer.
WHY IS ONE QUOTE THREE OR FOUR TIMES MORE THAN ANOTHER FOR WHAT LOOKS LIKE THE SAME THING?
This is probably the biggest misconception we come across. Most pallet racking on the market is cold formed from roughly 2mm steel. It’s cost effective and fine for a lot of applications. We also manufacture what we call structural pallet racking, built from genuinely heavier structural steel sections, designed around what’s actually being stored rather than off a standard spec sheet. It can be three to four times the price of a standard system, because the raw steel alone costs a lot more.
What you get for that money is a system built for an arduous environment, one that shrugs off the day to day knocks that would dent, bend or eventually wreck a lighter gauge system, and needs replacing or repairing far less often as a result. Not all racking is the same, even when it’s called the same thing. Ask exactly what gauge and grade of steel you’re actually being quoted for.
What you should look for
If we were choosing a racking supplier for our own warehouse, here’s what we wouldn’t compromise on: a genuine track record of designing and specifying systems, not just selling them. A team that works with you across sales, design and the contract itself, not just at the point of order. Someone who visits site and checks it actually fits before anything gets built. Delivery, installation and handover on time, including proper training so your team knows how to load and unload it correctly. And safety built in from the start, because loading has to respect the rack’s rated uniformly distributed load, something most warehouse teams are never actually taught, and getting it wrong is exactly what causes both accidents and insurance problems.
If a supplier can speak to all of that with real examples rather than a generic answer, that’s usually a good sign.